Skip to main content

Absolute Isolation for Adhesive Cementation of Veneers

(Afternoon tea pics 1632.2: Adhesive Cementation Workflow for Veneers) Absolute isolation utilized for adhesive bonding of veneers from #6-11. Primary/stabilizing clamp: Brinker B2 Secondary/retracting clamp: Brinker B4 Cement: Ivoclar Variolink […]

Read More

Smile Reconstruction with Pre-Prosthetic Orthodontics

Final staged post-operative integration check Multi-staged esthetic reconstruction with a pre-existing implant in the #9 position. Suresmile orthodontics was completed to resolve anterior crossbite and idealize buccal corridors, OB and […]

Read More

White Fillings that look Invisible

Recurrent caries on the MO aspect of #3 and deep caries on #2O. The Compositight 3D Fusion system coming in clutch for predictable re-creation of contact anatomy and strength. Final […]

Read More
« Previous PageNext Page »